Skip to main content
Industry illustration

Power & Energy · 3 months

IEC 61850 Substation Engineering Documentation

Translated SCL guides, IED technical files, commissioning reports and as-built packages for Middle East and Southeast Asia EPC bids.

Result Multilingual bid and as-built docs passed owner technical review on first submission

Mutual NDA available on request · Industry QA standards applied

Languages
3
Files
180+
Months core delivery
2
Standard citation review
100%

Background

Industry: Power & Energy Timeline: 3 months Languages: Chinese, English, Arabic Services: Standards translation, SCL documentation, As-built packages, etc.

The client operates in the power and energy value chain—exporting equipment, executing EPC packages, or replicating proven O&M models overseas. The program centers on “IEC 61850 Substation Engineering Documentation” with strict technical standards and delivery timelines.

An EPC contractor bidding on overseas digital substation projects needed IEC 61850 design notes, SCL annotations, commissioning records and as-built docs in English and Arabic for owner and consultant review.

Linguist assigned industry linguists, reviewers and a dedicated PM. Scope included Standards translation, SCL documentation, As-built packages, etc.. Within 3 months, we delivered and QA’d 3 languages—achieving: Multilingual bid and as-built docs passed owner technical review on first submission

Project challenges

  • Standard citations

    IEC 61850 clause references must not be mistranslated.

  • SCL/XML structure

    Configuration docs must preserve LN and DO naming.

  • Commissioning terms

    GOOSE/SV/MMS protocol terminology per industry usage.

  • Tight bid window

    Technical and commercial bids in parallel—staggered rush delivery.

Our approach

Phased delivery balancing quality, compliance and timeline.

  1. 01

    Scope alignment

    Confirm doc types, languages, timeline and review workflow.

  2. 02

    Glossary & TM

    Import client terminology and TM; lock key definitions.

  3. 03

    TEP & specialist review

    Industry linguists plus second reviewer; client spot-checks as needed.

  4. 04

    Delivery & versioning

    Module-based drops with change logs for ongoing updates.

Deliverables

  • SCL configuration guides
  • IED technical manuals
  • Commissioning test reports
  • As-built index

Project highlights

  • 61850 expertise

    SCL, LN and data model naming fluency.

  • EPC packages

    Organized for bid and as-built templates.

  • Rush lane

    48h turns on core technical bid sections.

  • Review support

    Fast revision rounds per owner comments.

Ready to Start Your Translation Project?

Our experienced team is ready to deliver high-quality translation services tailored to your industry and timeline.

Get a Free Quote