Skip to main content
Anonymized case

Power & Energy · 2.5 months

Offshore Wind EPC Electrical Documentation (Onshore 200MW)

Translated primary electrical design, pad-mount specs, collection lines and grid-connection files for European owner review on a 200MW onshore wind EPC.

Result German owner engineers confirmed parameter and warning accuracy; grid-connection review progressed smoothly

Mutual NDA available on request · Industry QA standards applied

Languages
3
Project capacity
200MW
Files
160+
Review revision rounds
3

Background

Industry: Power & Energy Timeline: 2.5 months Languages: Chinese, English, German Services: Electrical design, Grid-connection files, Equipment manuals, etc.

The client operates in the power and energy value chain—exporting equipment, executing EPC packages, or replicating proven O&M models overseas. The program centers on “Offshore Wind EPC Electrical Documentation (Onshore 200MW)” with strict technical standards and delivery timelines.

A domestic renewable EPC building a European onshore wind farm needed electrical design, substation and grid-connection annexes in EN/DE for TÜV and utility review.

Linguist assigned industry linguists, reviewers and a dedicated PM. Scope included Electrical design, Grid-connection files, Equipment manuals, etc.. Within 2.5 months, we delivered and QA’d 3 languages—achieving: German owner engineers confirmed parameter and warning accuracy; grid-connection review progressed smoothly

Project challenges

  • EU standards

    DIN/IEC references and German utility terminology.

  • Grid code language

    Accurate grid code and connection terms.

  • Mixed OEM sources

    Unified terms across CN/EN/DE vendor docs.

  • Review cycles

    Fast turns on owner and TÜV comments.

Our approach

Phased delivery balancing quality, compliance and timeline.

  1. 01

    Scope alignment

    Confirm doc types, languages, timeline and review workflow.

  2. 02

    Glossary & TM

    Import client terminology and TM; lock key definitions.

  3. 03

    TEP & specialist review

    Industry linguists plus second reviewer; client spot-checks as needed.

  4. 04

    Delivery & versioning

    Module-based drops with change logs for ongoing updates.

Deliverables

  • Electrical design specs
  • Pad-mount manuals
  • Grid-connection annexes
  • DE/EN glossary

Project highlights

  • Renewables

    Wind electrical and grid-connection terms.

  • German engineering

    TÜV and utility review context.

  • Grid code

    Precise connection clause translation.

  • Fast revisions

    48h response to review comments.

Ready to Start Your Translation Project?

Our experienced team is ready to deliver high-quality translation services tailored to your industry and timeline.

Get a Free Quote